Gallery - Ko'oloa'ula Phase 2 | Steeler Construction Supply

Ko'oloa'ula Phase 2

KO'OLOA'ULA PHASE 2 - KAPOLEI, HI

"The contractor loved the packaging for this job." This 22 building project in East Kapolei features some very specific lengths, which can be required for panelization and other means for quick installation. This project is on-going, but will comprise of over 700,000 pounds of Steeler steel framing products when complete.

Steeler Products Used:

COMPANY NEWS

Steel 101

Jul, 25 2016 — When Iron Ore mom loves Carbon dad very much and a little heat is applied, Steel is born. ... Read More »

Steel, An Upgrade

Jul, 18 2016 — Cold-formed steel may be your go-to framing system but you can upgrade to Steeler Inc.'s EQ Steel option, the Elite Framing System, the big brother to standard steel products. ... Read More »